2025 SDDOT Statewide Customer Satisfaction Survey

Caution: JavaScript execution is disabled in your browser or for this website. You may not be able to answer all questions in this survey. Please, verify your browser parameters.
Part 1: Interstate and Rural Divided Highways
[ idbkp ]
2451
[ IPGL ]
Location data from IP:
[ Q1 ]
Please rate your satisfaction with SDDOT's performance on Interstate highways (e.g., I-90, I-29, I-190, and I-229) and rural divided highways (e.g., US83 between Pierre and I-90, US12 from Aberdeen to Summit, and SD79 south of Rapid City) in South Dakota.
Interstate/Divided Highway Services/Features
01. Removal of roadway/shoulder debris (e.g., dead animals, glass, torn tires)
02. Snow and ice removal during the winter
03. Roadside care (e.g., mowing, removing overgrowth)
04. Condition of guardrails
05. Condition of bridges (e.g., pavement condition, bridge rideability, guardrail availability, smooth transitions on and off of bridges)
06. Smoothness of the surface of highways
07. Width and condition of shoulders
08. Visibility of pavement markings
09. Lighting and visibility at interchanges
10. Drainage from the surface of highways
11. Directional, regulatory, and informational signage
12. Overall flow of traffic
13. Overall feeling of safety while driving on interstate/divided highways
[ Q2 ]
Which FOUR of the items listed in Question 1 do you think should receive the MOST EMPHASIS from the Department of Transportation on Interstate and rural divided highways in South Dakota over the next TWO years?
[ Q3 ]
Please rate your satisfaction with the following:
1. Overall satisfaction with Interstate and Rural Divided Highways